Commissioning Agent
Consultants & Advisory
Independently verifies that a building's MEP systems actually work as designed before turnover, distinct from QA/QC and unrepresented on this site despite commissioning existing as a concept since the original build.
What is a Commissioning Agent?
A Commissioning Agent independently verifies that a building's mechanical, electrical, plumbing, and life-safety systems are installed, tested, and actually perform the way they were designed to before a building gets turned over to its owner. It's a distinct quality function from a QA/QC Inspector's day-to-day inspection work: a commissioning agent typically reports independently of the contractor and design team specifically so their testing and verification isn't influenced by whoever installed the systems, and the role is often required outright on projects pursuing LEED or similar green building certification.
What they do
- Develop a commissioning plan defining what systems will be tested and how
- Review design documents early in a project to catch commissioning issues before construction
- Witness and verify functional performance testing of HVAC, electrical, and life-safety systems
- Document deficiencies found during testing and track them through resolution
- Train building operations staff on the systems being turned over to them
- Prepare a final commissioning report required for LEED and similar green building certifications
A typical day
- 8:00 AMReview design documents for an upcoming project to identify commissioning requirements
- 9:30 AMWitness functional performance testing of a building's HVAC control system
- 12:00 PMDocument a deficiency found during testing and issue it to the responsible subcontractor
- 1:30 PMVerify a previously identified deficiency has been corrected
- 3:00 PMTrain the building's facilities team on the newly commissioned systems
Skills
Software
Education
- Required:
- Bachelor's degree in mechanical or electrical engineering, or significant relevant field experience; no license is legally required for this role, though the person performing commissioning is often a licensed PE on larger projects
- Preferred:
- ASHRAE's Building Commissioning Professional (BCxP) certification, or the Certified Building Commissioning Professional (CBCP) credential from the Association of Energy Engineers, both tiered by education and years of hands-on commissioning experience
- Not necessary:
- A background specifically in construction trades; many commissioning agents come from an MEP engineering or facilities operations background
Career progression
- 1.Commissioning Technician
- 2.Commissioning Agent
- 3.Senior Commissioning Agent or Commissioning Manager
- 4.Commissioning Practice Lead