hardhatU
Career

Loss Control / Risk Engineer

Insurance & Claims

Inspects jobsites on the insurer's behalf to manage risk before a loss happens, distinct from a Safety Manager who does similar work but for the contractor, not the insurance company.

What is a Loss Control / Risk Engineer?

A Loss Control Engineer, also called a Risk Engineer, inspects construction sites and facilities on behalf of an insurance company or broker, identifying hazards and risk factors that could lead to a claim and recommending changes to reduce that risk. It sounds similar to a Safety Manager's job, and the underlying hazard knowledge overlaps, but the two roles sit on opposite sides of the relationship: a Safety Manager works for the contractor building the project, while a Loss Control Engineer works for (or on behalf of) the insurer that's covering it, and their inspection findings can directly affect a project's insurance pricing and terms.

What they do

A typical day

Skills

Jobsite hazard identificationReport writing and documentationUnderstanding of OSHA and general safety standardsRisk assessment and data analysisClear communication with both underwriters and contractor safety teams

Software

Risk management information system (RMIS) software

Education

Required:
Bachelor's degree in occupational safety, engineering, or a related field, plus safety or risk-related field experience; no license is legally required for this role
Preferred:
Board of Certified Safety Professionals' Certified Safety Professional (CSP) credential, the same designation many contractor Safety Managers pursue, and the Associate in Risk Management (ARM) designation from The Institutes
Not necessary:
A construction-specific degree; many loss control engineers come from a general safety or engineering background

Career progression

  1. 1.Loss Control Field Representative
  2. 2.Loss Control / Risk Engineer
  3. 3.Senior Risk Engineer
  4. 4.Risk Engineering Manager

Who hires for this role

Insurance CompaniesInsurance Brokerages (in a risk services capacity)Independent Loss Control Consulting Firms