hardhatU
Get Qualified
Premium

CWI (Certified Welding Inspector)

Certified Welding Inspector (CWI)

A three-part certification verifying the separate skill of inspecting and judging someone else's welds against a code, built on a sliding scale of welding education and real experience.

CWI eligibility runs on a sliding scale between education and welding work experience rather than one fixed requirement: a bachelor's degree in welding plus 1 year of experience qualifies, as does a high school diploma plus 5 years of experience, or less than an 8th-grade education plus 12 years of experience. Every candidate, regardless of path, also has to pass a vision test, a reminder that inspection work depends on being able to actually see weld quality clearly.

The certification itself is three separate exam parts, each requiring a 72% passing score on its own. Part A (Fundamentals) is a 150-question computer-based test covering destructive and nondestructive testing, fabrication math, safety, metallurgy, and welding symbols. Part B (Practical) is hands-on, applying welding procedure specifications and inspection methods, actually executing required welds, plus 46 related questions. Part C (Code Book) is open-book in a narrow sense, one specific, approved code reference allowed, covering roughly 50 to 65 questions on applying that code.

AWS's welding inspector credentials come in three levels: Associate CWI (CAWI), an entry-level credential; CWI itself, the primary certification; and Senior CWI (SCWI), requiring additional qualifications beyond CWI. It's worth not confusing this with the welding certification a structural welder earns to a specific code like AWS D1.1 (already covered elsewhere on this site under the Welder career); that verifies someone can perform welds to a code, while CWI verifies the separate skill of inspecting and judging other people's welds against that same code.

Cost runs meaningfully higher than most credentials on this site, roughly $1,220 to $1,520 for initial certification depending on AWS membership status, before factoring in any optional training seminar package. Once earned, it stays valid for 9 years, with renewal checkpoints due at years 3 and 6, each offering several valid paths to maintain it: confirming continued relevant work experience, retaking Part B, completing 80 Professional Development Hours, or earning a Certified Radiographic Interpreter credential.

The practice questions below are original, covering CWI's real eligibility structure and exam content, not copied from any actual AWS exam. For the role this credential most directly supports on this site, see QA/QC Inspector.

HardHatU is an independent study resource and is not affiliated with, endorsed by, or sponsored by American Welding Society (AWS). "Certified Welding Inspector (CWI)" and any related names are trademarks of their respective owners, referenced here only so you can find the right exam to prepare for. Practice questions here are written independently and are not real exam content.

For official registration, pricing, and the real exam content outline, go straight to American Welding Society (AWS)'s own page.

Practice questions

Quick check: 1 of 15

What are the different paths to becoming eligible for the CWI exam, based on education and experience?

Quick check: 2 of 15

What's required of every CWI candidate regardless of their education/experience path?

Quick check: 3 of 15

How many separate exam parts make up the CWI certification, and what does each cover?

Quick check: 4 of 15

What's the format of Part A (Fundamentals)?

Quick check: 5 of 15

What does Part C (Code Book) actually allow a candidate to bring into the exam?

Quick check: 6 of 15

What passing score does each individual CWI exam part require?

Quick check: 7 of 15

What are the three certification levels in AWS's welding inspector credential family, from entry to advanced?

Quick check: 8 of 15

Roughly what does initial CWI certification cost?

Quick check: 9 of 15

How long does a CWI certification stay valid before needing renewal?

Quick check: 10 of 15

At each renewal checkpoint, what are a CWI holder's options to maintain the credential?

Quick check: 11 of 15

Which career on this site names the CWI directly as a preferred credential?

Quick check: 12 of 15

Is a CWI the same thing as the welding certification a structural welder earns to a code like AWS D1.1?

Quick check: 13 of 15

Why does CWI eligibility accept a path with no formal education at all, given enough experience?

Quick check: 14 of 15

What does Part B (Practical) actually test, beyond written questions?

Quick check: 15 of 15

For someone using this site to plan toward inspection work, what's the realistic relationship between welding experience and pursuing CWI?

Reviewed 2026-10. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.