HammerTech
Safety
A safety and compliance platform built specifically for construction, covering worker orientations, permits, and inspections in one system rather than several disconnected tools.
What it does
HammerTech centers on getting a worker's orientation and safety assessment done digitally, often before they ever set foot on site, then keeps permits, safety data sheets, and their expiration dates in one tracked place instead of a filing cabinet. Safety inspections and audits log against a project's own compliance requirements, and incident reports tie back to the same worker and site records the rest of the platform already has on file.
Key features
- Digital worker orientations and inductions that can be completed before someone ever steps on site
- Centralized permit tracking, including hot work permits, plus safety data sheet storage with expiration alerts
- Safety inspections and audits logged against a project's own compliance requirements
- Incident reporting tied to the same worker and site records the rest of the platform already tracks
How it's actually used
- A new worker completes a digital site orientation and safety assessment from home before their first day on a jobsite
- A safety manager gets an automatic alert before a subcontractor's insurance certificate or safety data sheet expires, instead of discovering it lapsed after the fact
Tutorials
Tutorial videos for this tool are coming soon.
Good to know
- Pricing:
- Custom quote through HammerTech's sales team rather than published pricing.
- Website:
- https://hammertech.com
Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.