hardhatU
Software
Premium

STACK

Estimating

A cloud-based takeoff and estimating tool, where a contractor measures a digital plan set to build a bid instead of measuring paper drawings by hand.

What it does

STACK lets an estimator upload a digital plan set and measure it directly on screen, calibrated to the drawing's real scale, then turns that completed takeoff into a priced estimate using built-in labor and material cost data. Markups and takeoffs stay attached to the exact plan sheet they were measured from, so a reviewer can see both the number and where it came from in the same place, and a separate field side of the platform carries the same job forward once it's actually won.

Key features

  • Digital takeoff tools for measuring length, area, and count directly off an uploaded plan set
  • Cost estimating that turns a completed takeoff into a priced bid using built-in labor and material data
  • Markup and document sharing so a takeoff and its underlying plan sheet stay attached to each other
  • Field-side project tracking that connects a winning estimate to the job once it's actually under construction

How it's actually used

  • An estimator measures every wall and door on a digital floor plan to build a material list for a bid instead of walking a printed set with a scale ruler
  • A preconstruction team compares a takeoff-based estimate against the actual buyout numbers once subcontractor bids come in, to see where the original estimate was off

Tutorials

Tutorial videos for this tool are coming soon.

Good to know

Pricing:
Subscription-based, priced separately for the estimating and takeoff side and the field-management side, with the two combinable into one broader plan.

Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.