hardhatU
Software
Premium

Xactimate

Insurance & Restoration

The estimating software the property insurance industry has largely standardized on for pricing repair work after a claim, made by Verisk's Xactware division.

What it does

Xactimate lets an adjuster, restoration contractor, or public adjuster sketch a damaged structure's layout, measure the areas affected, and price the repair using a shared, regionally localized line-item price list. Because nearly every party to a claim references the same underlying price list, a dispute over an estimate usually comes down to specific line items rather than two completely incompatible formats. A field visit can start an estimate on a tablet or phone, with the same file finished later back at a desk, so the office and field sides of the work stay in one record instead of two.

Key features

  • 2D and 3D sketching tools for drawing a damaged structure's layout from field measurements
  • A standardized, regionally priced line-item database that every party to a claim can reference against
  • Mobile capture in the field with the estimate finished later on desktop, so a site visit doesn't require carrying a laptop
  • Photo documentation attached directly to specific line items in the finished estimate

How it's actually used

  • An insurance adjuster sketches a water-damaged room's dimensions on a tablet during an inspection and finishes pricing the repair later from the same file
  • A restoration contractor and an adjuster compare two independently written estimates for the same loss line item by line item to negotiate their specific disagreements

Tutorials

Tutorial videos for this tool are coming soon.

Good to know

Pricing:
Subscription-based, sold in monthly, six-month, and annual terms for the full professional edition, with a lower-cost standard edition available for single-platform access only.

Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.