hardhatU
Career

Sheet Metal Worker

Field & Trades

Fabricates and installs the ductwork, flashing, and metal roofing systems that move air through a building and keep water out of it.

What is a Sheet Metal Worker?

A Sheet Metal Worker fabricates and installs sheet metal components on a project, most commonly HVAC ductwork, but also roofing panels, flashing, and architectural metal. A lot of the fabrication happens in a shop ahead of time, cutting and forming metal to exact duct-run dimensions from drawings, before the finished pieces move to the jobsite for installation and connection to air handling equipment. The trade has its own apprenticeship and union (SMART) distinct from an HVAC Technician, who installs and services the equipment those ducts connect to rather than fabricating the ductwork itself.

What they do

A typical day

Skills

Reading HVAC and sheet metal shop drawingsMetal cutting, forming, and fabricationPrecise measurement and layoutSealing and insulating ductworkWorking safely at height for duct and roofing installation

Software

Generally none; this is a hands-on field trade

Education

Required:
High school diploma or equivalent, then a registered apprenticeship through the SMART union, typically around four years combining paid on-the-job training with roughly 160 hours of classroom instruction per year; sheet metal work isn't separately state-licensed in most places
Helpful:
OSHA 10 or 30 certification (not a nationwide legal requirement, though several states, including New York, Massachusetts, Connecticut, Nevada, Missouri, and Rhode Island, legally require it for workers on public construction projects)
Not necessary:
A four-year college degree; the apprenticeship-to-journeyman route is the standard path into the trade

Career progression

  1. 1.Apprentice Sheet Metal Worker
  2. 2.Journeyman Sheet Metal Worker
  3. 3.Shop or Field Foreman
  4. 4.Sheet Metal Contractor or Superintendent

Who hires for this role

Sheet Metal and HVAC SubcontractorsMechanical ContractorsRoofing Contractors (for metal roofing specialty work)