Construction

Step 6 in the construction process

What happens

This is the phase most people picture when they think "construction": the building actually gets built. But it isn't one continuous activity; it's a sequence of trades handing a project off to each other in a specific order, where starting something too early usually costs more than starting it late. Take a typical mid-size commercial building, picking up on the graded, staked site that Site Preparation & Mobilization already handed over. Concrete crews inspect and pour footings and foundation walls first, with rebar and formwork checked before the pour rather than after, and framing on top only starts once the concrete has gained enough strength to bear that load, not once it's fully cured, which takes far longer. Structural framing follows, steel or wood, depending on the building, giving the project its actual shape for the first time. Only once the structure is enclosed (a "dried-in" building, meaning the roof and exterior walls are up) do the interior trades start, and they go in a specific order too: HVAC ductwork first, since it needs the most space and is the least flexible, then plumbing, which needs a working slope, then electrical last, since wiring is the easiest of the three to route around whatever's already there. Insulation and a rough-in inspection follow before drywall closes the walls up. Finishes, flooring, paint, fixtures, trim, come last, because they're the easiest thing to damage if earlier trades are still moving material through the space. Running beneath that visible sequence, a second process never stops: the paperwork that keeps the sequence honest. RFIs get filed and answered when drawings don't match reality. Change orders get signed whenever the scope, price, or schedule actually changes, whether the owner asked for it or a site condition forced it. Daily reports track what actually happened on site, in case a dispute needs reconstructing later. A project manager's real job during this phase isn't swinging a hammer; it's making sure the physical sequence and the paper trail stay in sync, so nobody's building something that was never actually approved.

How long this takes

For a mid-size commercial building, Construction is usually the single longest phase on the calendar, typically twelve to twenty-four months, though a single-family home might see four to eight months of actual construction and a major hospital or high-rise can run past three years. What stretches it: weather delays during foundation pours and steel erection, material lead times arriving later than the schedule assumed, tight labor availability, and inspections that have to happen in sequence rather than all at once. What compresses it: prefabricating components off-site while the foundation is still curing, and a general contractor who starts early trade packages before every drawing is fully finished.

Why this timing matters

By the time a project reaches Construction, the cost-of-change curve is already near its steepest point. A decision changed during Design might mean redrawing a wall on a computer; the same decision changed during Construction can mean tearing out concrete that already cured, or pulling wire that's already run through a wall that's already closed up. That's not because more mistakes happen on-site, it's because every phase before this one already assumed things would go a certain way, and undoing that assumption now means redoing physical work instead of a drawing. It's part of why a good RFI process matters so much here: catching a conflict on paper before it's built is dramatically cheaper than catching it after.

Who's involved

General ContractorSubcontractorsProject ManagerSuperintendentInspectors

Common misconception

A common misconception is that once permits are pulled and the contract is signed, the design is finished and Construction just executes it. In reality, a meaningful share of a project's RFIs get generated during Construction itself, meaning design and construction overlap more than outsiders expect: the design isn't fully finished, it's being finished in real time as crews hit details the drawings didn't fully resolve.

What can go wrong

Most construction-phase problems trace back to something happening out of order, or a decision getting made without being written down. A common one: a subcontractor gets delayed by a supply shortage on a specific material, but the crew scheduled to work right after them starts on time anyway, because nobody updated the schedule. Now two trades are trying to occupy the same space, and the second crew either stands around getting paid to wait, or works around the first crew badly enough that something needs to be redone later. Weather causes a similar chain reaction on foundation pours and steel erection specifically, since concrete needs the temperature within a certain range to cure properly and steel crews can't safely work high up in heavy wind: a week of bad weather during a pour doesn't just cost that week, it pushes every trade scheduled after it. And unclear drawings cause slowdowns that are easy to underestimate: a framing crew that hits a detail the plans don't fully explain either guesses (risky) or stops and waits for an answer (slow), and an RFI that takes a week to come back can stall a whole crew for that week if there's nothing else for them to work on. None of these are unusual or rare; they're the normal texture of a construction schedule, which is exactly why tracking RFIs and change orders closely, and building some slack into a schedule for weather, matters as much as it does.

In practice

Construction itself rarely runs as one clean pass through the sequence this section describes. A change discovered on one floor can send a crew back to redo work on a floor that was supposedly already finished, punch-list-style fixes happen throughout rather than only at the very end, and under fast-track or design-build delivery, crews are often actively building one part of the structure while Design is still finishing the drawings for another part entirely, so "Design ends, then Construction begins" understates how much the two genuinely overlap on a real jobsite.