Document Control Specialist
Project & Operations
Owns the submittal logs, RFI logs, and drawing revisions that keep everyone on a project working from the same current information, a real entry point into the office side of construction.
What is a Document Control Specialist?
A Document Control Specialist manages the flow of project documentation, submittals, RFIs, drawing revisions, contracts, and correspondence, making sure everyone on a project is working from the current version of every document and that a complete, organized record exists if a dispute or claim ever needs one. On a large project, dozens of drawing revisions and hundreds of submittals move through the office at once; a document control specialist's job is to make sure nothing gets lost, nothing gets built off an outdated drawing, and every approval has a clear paper trail.
What they do
- Maintain submittal, RFI, and transmittal logs, tracking status and due dates
- Distribute current drawing revisions and flag outdated versions before they cause a mistake
- Organize and archive project correspondence, contracts, and closeout documentation
- Set up and administer document control within cloud-based project management software
- Support the project team by tracking document turnaround times and flagging bottlenecks
- Assemble the final project record set at closeout
A typical day
- 7:30 AMReview overnight submittals and RFIs, logging each one and assigning it to the right reviewer
- 9:00 AMDistribute a new drawing revision to the field team and update the master drawing log
- 11:00 AMFollow up on submittals approaching their review deadline
- 1:30 PMOrganize contract correspondence for an upcoming change order review
- 3:30 PMAudit the project's document control software for missing or misfiled records
Skills
Software
Education
- Required:
- High school diploma or equivalent; no license is legally required for this role
- Preferred:
- Associate's or bachelor's degree in construction management, business administration, or a related field
- Helpful:
- The Construction Specifications Institute's Construction Documents Technologist (CDT) certification, which covers construction documentation standards and is a recognized credential for this kind of role
- Not necessary:
- A construction-specific degree; many document control specialists move into the role from general administrative or office-management backgrounds and learn the construction-specific process on the job
Career progression
- 1.Document Control Specialist
- 2.Senior Document Control Specialist
- 3.Project Engineer or Project Coordinator
- 4.Contracts Administrator or Project Manager
Who hires for this role
Explore next