hardhatU
Software
Premium

Procore

Project management

A cloud-based construction management platform that many general contractors, owners, and specialty contractors use to run a project from one place: budget, schedule, drawings, RFIs, submittals, safety, and daily field reports, all connected instead of living in separate spreadsheets and email threads.

What it does

Procore centers on a single project record everyone on the job can see at the same permission level they're supposed to have: the superintendent in the field, the project manager in the office, and the owner checking progress remotely are all looking at the same live drawings, the same RFI log, and the same budget, instead of whoever has the latest version emailed to them. When a superintendent logs a daily report from a tablet on-site, or a subcontractor uploads a photo of a completed inspection, that update is immediately visible to everyone else with access, which is the specific problem it's built to solve: construction projects generate huge amounts of paperwork (RFIs, submittals, change orders, inspection reports) across dozens of people, and most disputes and delays trace back to someone not seeing the right version of something at the right time.

Key features

  • Drawing and specification management with version control, so the field always opens the current set instead of an outdated PDF
  • RFI and submittal tracking with due dates and automatic reminders
  • Daily log / field report tool for superintendents, from a phone or tablet on-site
  • Budget and change order tracking tied to the project's actual cost codes
  • Photo and document storage tied to specific locations on the drawings
  • Scheduling tools that integrate with the project's RFIs and submittals

How it's actually used

  • A superintendent photographs a completed wall before it's covered by drywall and tags the photo to that exact location on the floor plan, so it's easy to find months later if a question comes up about what's behind that wall
  • A project engineer submits an RFI about a dimension conflict directly from the drawings, and the architect's response becomes part of the permanent project record instead of a buried email
  • A project manager tracks every change order against the original budget in real time, instead of reconciling a spreadsheet at the end of the month

Tutorials

Tutorial videos for this tool are coming soon.

Good to know

Pricing:
Subscription-based and licensed to the company/project rather than sold at a flat consumer price: a contractor typically gets a quote from Procore's sales team based on project volume, not a price pulled off a public price list.

Reviewed 2026-09. Costs, timelines, and licensing details vary by location and change over time. Treat these as a starting point, not a quote.