Renewable Energy Project Manager

Specialized Construction

Manages solar, battery-storage, and microgrid builds from permitting through commissioning, the project-management path into the fastest-growing segment of the construction industry.

What is a Renewable Energy Project Manager?

A Renewable Energy Project Manager runs solar, battery storage, and other renewable energy construction projects the same way a general Project Manager runs a building project, managing budget, schedule, permitting, and subcontractors, but specialized around the specific permitting, utility interconnection, and equipment commissioning process renewable projects require. It's a natural next step for a Solar PV Installer who wants to move off the tools and into running projects, or for a general Project Manager who wants to specialize in the renewable energy side of the industry.

What they do

A typical day

Skills

Project scheduling and budget managementUnderstanding of solar and battery storage permitting and interconnection processesSubcontractor and vendor coordinationReading solar and electrical system design drawingsClient and utility company communication

Software

Solar design and monitoring software (varies by installer/manufacturer)Procore

Education

Required:
Bachelor's degree in construction management, engineering, or a related field, plus project management experience, ideally including some renewable energy or electrical project exposure; no license is legally required for this role
Preferred:
Project Management Professional (PMP) certification, the same credential used broadly across construction project management, and NABCEP's PV Installation Professional certification for hands-on credibility with installation crews
Not necessary:
A background specifically in solar installation; many renewable energy project managers come from general construction project management and learn the renewable-specific permitting and equipment on the job

Career progression

  1. 1.Assistant Project Manager (Renewable Energy)
  2. 2.Renewable Energy Project Manager
  3. 3.Senior Project Manager or Director of Construction
  4. 4.VP of Construction or Operations (renewable energy developer)

Who hires for this role

Solar and Renewable Energy DevelopersElectrical Contractors (with a renewable energy division)Utility Companies (for utility-scale renewable projects)