Solar PV Installer

Field & Trades

Installs the rooftop and ground-mount solar panel systems behind the fastest-growing segment of the construction trades.

What is a Solar PV Installer?

A Solar PV Installer mounts and wires photovoltaic panel systems on roofs, ground mounts, and carports, connecting them into a building's electrical system. The role sits somewhere between roofing and electrical work: installers handle the physical racking and panel mounting themselves, but the electrical interconnection, especially anything past the panel's DC output, often has to be done or signed off by a licensed electrician depending on the state and the scope of work. Licensing for the trade itself is inconsistent nationwide, which is part of what makes it confusing to newcomers: some states have a dedicated solar contractor license, most simply fold solar work under existing electrical or general contractor licensing, and a national certification (NABCEP) has become the de facto credential installers use to prove their skills regardless of which state they're in.

What they do

A typical day

Skills

Electrical fundamentals (DC and AC systems)Roofing and racking installationReading solar system design drawingsWorking safely at heightSystem testing and commissioning

Software

Solar design and monitoring software (varies by installer/manufacturer)

Education

Required:
High school diploma or equivalent, then on-the-job training or a trade school solar program; licensing varies significantly by state. A minority of states, plus Puerto Rico, have a dedicated solar contractor license, most other states instead require installers to work under a licensed electrical or general contractor, and a smaller number have no state-level licensing requirement at all
Preferred:
NABCEP (North American Board of Certified Energy Practitioners) PV Installation Professional certification, a voluntary national credential that several states (including Maine, Minnesota, and Wisconsin) require for a project to qualify for state solar incentive programs, that Utah requires as a prerequisite for its state solar contractor license, and that Rhode Island accepts as one of several qualifying credentials for its Renewable Energy Professional license
Not necessary:
A four-year college degree; this is a hands-on, certification-driven trade

Career progression

  1. 1.Solar Installer (entry-level)
  2. 2.Lead Installer or Crew Lead
  3. 3.Solar Electrician (with electrical licensure) or Site Supervisor
  4. 4.Solar Contractor or Renewable Energy Project Manager

Who hires for this role

Residential and Commercial Solar Installation CompaniesElectrical Contractors (with a solar division)Renewable Energy Developers