hardhatU
Career

Project Engineer

Project & Operations

The project management team's problem-solver and paperwork owner, the entry point into a Project Manager career for most people who don't come up through the trades.

Project Engineer

What is a Project Engineer?

A Project Engineer (PE, not to be confused with a licensed Professional Engineer) supports a Project Manager by owning the day-to-day documentation and coordination that keeps a project moving: submittals, RFIs, drawing logs, and subcontractor coordination. It's usually the entry-level role on the project management track, and the fastest way for someone without trade experience to learn how a project actually runs before stepping into the PM seat themselves.

What they do

A typical day

Skills

Organization and documentationReading construction drawingsBasic scheduling and budgeting conceptsCommunication across owner, architect, and subcontractorsAttention to detail

Software

ProcoreBluebeamMicrosoft Project

Education

Required:
High school diploma or equivalent
Preferred:
Bachelor's degree in construction management, civil engineering, or a related field
Helpful:
OSHA 10 certification, not a nationwide legal requirement, though several states (including New York, Massachusetts, Connecticut, Nevada, Missouri, and Rhode Island) legally require it for workers on public construction projects
Not necessary:
A four-year degree is common for this entry point but not the only path; some Project Engineers move over from an estimating or field role instead

Career progression

  1. 1.Project Engineer
  2. 2.Assistant Project Manager
  3. 3.Project Manager
  4. 4.Senior Project Manager

Who hires for this role

General ContractorsConstruction Management FirmsOwners with in-house construction teams