hardhatU
Concept

Foodservice Equipment

CSI Division 11, Equipment

The commercial-grade cooking, refrigeration, and prep equipment, ranges, walk-in coolers, exhaust hoods, dish machines, installed in a restaurant, cafeteria, or institutional kitchen, requiring close coordination between the equipment's specific utility requirements, gas, water, drainage, dedicated electrical circuits, makeup air for the exhaust hood, and the building's rough-in.

Why it matters

Foodservice equipment often isn't finally selected until late in design, since the kitchen consultant is a specialty separate from the base architect, and a late equipment change can leave a utility rough-in that no longer matches what's actually going to be installed.

On a real project

A restaurant's kitchen consultant finalizes the exact make and model of a commercial range and exhaust hood, and the general contractor coordinates gas line sizing, makeup air, and hood fire suppression rough-in against that specific equipment's cut sheets before drywall closes the space in.

Who this matters most to

A MEP Engineer designs the utility rough-in the equipment depends on. An Electrician and Plumber install the dedicated circuits and gas and drain connections.

Where this goes wrong

A general contractor roughs in utilities based on an early foodservice equipment schedule, but the kitchen consultant later substitutes a range model with a larger gas demand. The rough-in gas line is undersized for the equipment that actually arrives, forcing rework before the final connection can be made.