hardhatU
Career

Drywall Installer & Finisher (Taper)

Field & Trades

Hangs and finishes the walls and ceilings of almost every interior space, the trade that turns a framed structure into rooms.

Drywall Installer & Finisher (Taper)

What is a Drywall Installer & Finisher (Taper)?

A Drywall Installer (hanger) and Finisher (taper) install gypsum board on walls and ceilings, then tape, mud, and sand the joints to create a smooth, paint-ready surface. Hanging and finishing are sometimes done by the same person and sometimes split into two specialties on larger crews. No government license is legally required to do this work.

What they do

A typical day

Skills

Precision measuring and cuttingPatience and a steady hand for finish coatsPhysical stamina (hanging overhead ceiling panels is demanding)Attention to detail (finished walls show every flaw once painted)Basic math for material takeoffs

Software

Generally none; this is a hands-on field trade

Education

Required:
High school diploma or equivalent. No license is legally required to work as a drywall installer or finisher
Preferred:
On-the-job training or a formal apprenticeship
Helpful:
Specialized training in fire-rated or acoustic assembly installation for commercial work
Not necessary:
A college degree; this trade is learned almost entirely on the job

Career progression

  1. 1.Drywall Helper
  2. 2.Installer or Finisher
  3. 3.Lead Finisher or Foreman
  4. 4.Superintendent or own a drywall contracting business

Who hires for this role

Drywall SubcontractorsGeneral Contractors