hardhatU
Career

Surveyor

Technology & Design

Establishes the exact boundaries, elevations, and reference points a project gets built against, the one role where being off by an inch can mean a building in the wrong place.

What is a Surveyor?

A (Land) Surveyor measures and maps land boundaries, elevations, and physical features, then translates that into the control points and benchmarks a construction crew builds from: where the building corner actually sits, what elevation the finished floor needs to be. Practicing as a Licensed Professional Land Surveyor requires state licensure, which in nearly every U.S. state means passing the NCEES Fundamentals of Surveying (FS) exam early in a surveying career and the NCEES Principles and Practice of Surveying (PS) exam after gaining qualifying experience, the same two-exam structure a licensed engineer goes through, run by the same national organization (NCEES).

What they do

A typical day

Skills

Precise field measurement and equipment operation (GPS, total stations)Reading legal property descriptions and site plansGeometry and trigonometryAttention to detail (small errors compound into real legal and construction problems)Increasingly, drone and 3D scanning technology

Software

Surveying and mapping software (e.g. AutoCAD Civil 3D)

Education

Required:
Varies by state, but licensure as a Professional Land Surveyor (PLS) generally requires a surveying-related degree or qualifying experience, passing the NCEES Fundamentals of Surveying (FS) exam, several years of supervised experience, and then the NCEES Principles and Practice of Surveying (PS) exam
Preferred:
Bachelor's degree in surveying or geomatics
Helpful:
Drone/UAV pilot certification, as aerial data collection becomes more common in the field
Not necessary:
Entry-level field crew positions (survey technician/party chief track) don't require a degree; many surveyors start there and pursue licensure over time

Career progression

  1. 1.Survey Technician
  2. 2.Party Chief
  3. 3.Licensed Professional Land Surveyor
  4. 4.Survey Manager or Owner of a Surveying Firm

Who hires for this role

Surveying FirmsCivil Engineering FirmsGeneral Contractors (larger firms with in-house survey crews)